在线客服
Copper High Performance Condensing Tube

Copper High Performance Condensing Tube

Copper high performance condenser tubes with specially designed outer fin shape of the tube increases the heat transfer area and reduces the thickness of the liquid film on the fins, thereby increasing the condensation heat transfer coefficient; at the same time, there are spiral channels in the tube to enhance heat transfer within the tube; both sides enhance heat transfer. The combined effect can significantly increase the overall heat transfer coefficient.
Send Inquiry
Product Introduction
Product Detail:

 

This tube type adopts a proprietary design. The fin ends are equipped with sharp protrusions in both the radial and axial directions, which can pierce the refrigerant liquid film, destroy its surface tension, accelerate the dripping of condensed liquid, and have a high condensation exchange rate. The thermal coefficient and the condensation effect are significant.

product-600-600
product-600-600

 

Features:

 

– Increased heat transfer on the shell and tube side

– Superior overall heat transfer performance

– Substantial reduction of heat exchanger size and refrigerant charge

– Significant improvement in life cycle energy efficiency

 

Parameters:

 

product-1340-1146

 

Structures:

 

product-1350-544

 

Testing Equipment:

 

Spectrometer

CCD Microscope

Tensile Tester

Oil Content Analyzer

Hardness Tester

Heat Transfer Performance Test System for Single Tube

 

Applications:

 

Chillers such as central air conditioning centrifuges and screw machines, shell and tube heat exchangers with small temperature difference conditions, heat exchangers with phase change, etc.

product-648-420
product-648-420

 

FAQ:

 

Q: Do you have a minimum order quantity?

A: Yes, we require all international orders to have an ongoing minimum order quantity. If you are looking to resell but in much smaller quantities, we recommend you check out our website

Q: Can you supply the relevant documentation?

A: Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.

Q: What is the average lead time?

A: For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements in your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

Hot Tags: copper high performance condensing tube, China copper high performance condensing tube manufacturers, suppliers, factory, heating copper pipe, 5 16 od copper tubing, 1 type l copper pipe, 2m 15mm copper pipe, 3 4 acr copper tubing, 2 copper pipe

Send Inquiry

whatsapp

Phone

E-mail

Inquiry